How should the geomembrane be laid and what problems should be paid attention to in the construction process?

Release time:2022/3/28
This article is read:1095times

How should the geomembrane be laid and what problems should be paid attention to in the construction process?

How should the geomembrane be laid and what problems should be paid attention to in the construction process?


1. Before laying geomembrane, the corresponding qualified acceptance certificate documents of civil engineering should be obtained.


2. Before cutting the geomembrane, its relevant dimensions should be accurately measured, and then cut according to the actual size. Generally, it is not suitable to cut according to the size shown in the figure. It should be numbered one by one and recorded in detail on a special form.


3. When laying geomembrane, we should strive for less welds, and try to save raw materials on the premise of ensuring quality. At the same time, it is easy to guarantee the quality.


4. The lap width of the seam between the film and the film is generally not less than 10cm. Usually, the direction of the welding seam is parallel to the slope, that is, it is arranged along the slope direction.


5. Usually in corners and deformed areas, the length of the seam should be shortened as much as possible. Except for special requirements, on slopes with a slope greater than 1:6, within 1.5 meters from the top slope or the stress concentration area, try not to set welds.


6. During the laying of the geomembrane, artificial folds should be avoided. When the temperature is low, it should be tightened as much as possible and flattened.


7. After the geomembrane is laid, walking on the membrane surface, moving tools, etc. should be minimized. Any objects that can cause harm to the anti-seepage membrane should not be placed on the membrane or carried on the membrane to avoid damage to the membrane. cause accidental damage.


It is recommended to pay attention to the following aspects of this project:


①After the composite geomembrane is welded into a finished product, first make the lake bottom mortar protective layer.


②The bridge foundation is waterproof, adopts the steel bar through-membrane welding method, and uses a mortar protective layer to prevent the hidden quality risks caused by electric welding.


③The pasting of the composite geomembrane and the wall must prevent the appearance of large-scale hollowing.

How should the geomembrane be laid and what problems should be paid attention to in the construction process?
Previous:How to choose the application scope of 3D composite drainage networknext:How to choose the application scope of 3D composite drainage network
Manufacturer of Geosynthetic and new building materials industry

Service hotline:

+86?18605386600

Contact us:

Contact: Anna Han

Tel/Whatsapp: +86 18605386600

Email: 18605386600@163.com

Enterprise Tel: +86 0538-8999499

1111

   Taian Tenglu Engineering Materials Co.,Ltd.         魯ICP備17054754號-1                      公示信息

阿克| 壶关县| 永宁县| 诸暨市| 孟村| 文化| 赤壁市| 兴国县| 桦川县| 合江县| 长岛县| 虹口区| 贞丰县| 上虞市| 措勤县| 徐水县| 陈巴尔虎旗| 新宾| 黑山县| 南华县| 香港| 达日县| 乐清市| 松原市| 伊金霍洛旗| 襄垣县| 陇西县| 绵阳市| 资溪县| 嘉荫县| 扎兰屯市| 弥渡县| 溧阳市| 铜陵市| 扶绥县| 营口市| 曲松县| 通渭县| 板桥市| 安泽县| 墨玉县|