亚洲图片视频欧美日韩|欧美国产国产综合视频|未满十八18禁污污免费|国产亚洲一区二区三区啪|精品久久久亚洲午夜久久久|码一区二区人妻互動與交流|国产精品日韩精品v欧美精品|国产乱人伦中文无无码视频试看

Hi! Welcome to Taian Tenglu Engineering Materials Co.,Ltd.!

National Consulting Hotline:

+86 18605386600

(WeChat same number)

Your location:Home>News Center

How should the geomembrane be laid and what problems should be paid attention to in the construction process?

Release time:2022/3/28
This article is read:1095times

How should the geomembrane be laid and what problems should be paid attention to in the construction process?

How should the geomembrane be laid and what problems should be paid attention to in the construction process?


1. Before laying geomembrane, the corresponding qualified acceptance certificate documents of civil engineering should be obtained.


2. Before cutting the geomembrane, its relevant dimensions should be accurately measured, and then cut according to the actual size. Generally, it is not suitable to cut according to the size shown in the figure. It should be numbered one by one and recorded in detail on a special form.


3. When laying geomembrane, we should strive for less welds, and try to save raw materials on the premise of ensuring quality. At the same time, it is easy to guarantee the quality.


4. The lap width of the seam between the film and the film is generally not less than 10cm. Usually, the direction of the welding seam is parallel to the slope, that is, it is arranged along the slope direction.


5. Usually in corners and deformed areas, the length of the seam should be shortened as much as possible. Except for special requirements, on slopes with a slope greater than 1:6, within 1.5 meters from the top slope or the stress concentration area, try not to set welds.


6. During the laying of the geomembrane, artificial folds should be avoided. When the temperature is low, it should be tightened as much as possible and flattened.


7. After the geomembrane is laid, walking on the membrane surface, moving tools, etc. should be minimized. Any objects that can cause harm to the anti-seepage membrane should not be placed on the membrane or carried on the membrane to avoid damage to the membrane. cause accidental damage.


It is recommended to pay attention to the following aspects of this project:


①After the composite geomembrane is welded into a finished product, first make the lake bottom mortar protective layer.


②The bridge foundation is waterproof, adopts the steel bar through-membrane welding method, and uses a mortar protective layer to prevent the hidden quality risks caused by electric welding.


③The pasting of the composite geomembrane and the wall must prevent the appearance of large-scale hollowing.

How should the geomembrane be laid and what problems should be paid attention to in the construction process?
Previous:How to choose the application scope of 3D composite drainage networknext:How to choose the application scope of 3D composite drainage network
Manufacturer of Geosynthetic and new building materials industry

Service hotline:

+86?18605386600

Contact us:

Contact: Anna Han

Tel/Whatsapp: +86 18605386600

Email: 18605386600@163.com

Enterprise Tel: +86 0538-8999499

1111

   Taian Tenglu Engineering Materials Co.,Ltd.         魯ICP備17054754號-1                      公示信息

枞阳县| 酒泉市| 湄潭县| 洪洞县| 平谷区| 枞阳县| 葫芦岛市| 安岳县| 丽水市| 炎陵县| 德兴市| 广饶县| 齐河县| 沈阳市| 乐山市| 西乌珠穆沁旗| 迁西县| 岚皋县| 新泰市| 多伦县| 奉贤区| 滦南县| 辉县市| 安顺市| 民和| 温州市| 隆回县| 高阳县| 顺义区| 定结县| 手游| 庆城县| 石阡县| 松阳县| 德令哈市| 黎平县| 嘉善县| 青川县| 财经| 方山县| 衡阳市|